We have the cabinet frames in, which you can see and the flooring has been prepped for the tile.
Doug the contractor says that we should be done in about a week and a half, which will only be about 5 weeks total to turn this project around. I LOVE THEM.
The best part too is that Brian will be home this weekend for the first time in 4 weeks and the house will almost be finished. I can't wait to see him and for him to see the amazing job they are doing!!